Arch Companies - Myrtle Point Tower Division 8 Supply
![WhatsApp+Image+2023-11-06+at+16.25.49_d52aa676.jpg](https://images.squarespace-cdn.com/content/v1/5e6756dc28b9185155759969/1699306758936-85J83ARQJWE7A7HF9ED0/WhatsApp%2BImage%2B2023-11-06%2Bat%2B16.25.49_d52aa676.jpg)
SCOPE
Hollow metal door & frame supply along with requisite door hardware per schedules.
TIMELINE
6 weeks.
PRODUCT(S)
Marks USA, NYC-Doors, Legacy Manufacturing
PROJECT PERFORMANCE
Cosmic Fischer was awarded the supply of all hollow metal openings at this new-construction tower on St. Nicholas Ave in Queens, NY. All openings were built to schedule, prepared for all hardware, and field-verified prior to delivery.
CLIENT ADVANTAGE
We provided our Client with end-to-end consulting, manufacturing, supply and delivery on all Division 8 openings for this project, including a heavy focus on value-engineering the original specifications by the Architect. Our ‘value-engineering’ scope providing the same Grade 1 hardware requirements, but saved more than 55% on the bill-of-materials, amounting to more than $400,000 in construction savings. Throughout the process, Cosmic Fischer Locks representatives were onsite to walk-through the build process as concrete was poured to ensure openings were built to size. The end result provided for a zero-reject project on more than 350 openings.
![WhatsApp Image 2023-11-06 at 16.25.49_40eb38ad.jpg](https://images.squarespace-cdn.com/content/v1/5e6756dc28b9185155759969/1699306852228-50T7I3BS4DYVLVQPF5YU/WhatsApp+Image+2023-11-06+at+16.25.49_40eb38ad.jpg)
![WhatsApp Image 2023-11-06 at 16.25.49_439fe027.jpg](https://images.squarespace-cdn.com/content/v1/5e6756dc28b9185155759969/1699306852228-CLFIEN486MPOLAF25HR0/WhatsApp+Image+2023-11-06+at+16.25.49_439fe027.jpg)
![WhatsApp Image 2023-11-06 at 16.25.49_d74b8ea2.jpg](https://images.squarespace-cdn.com/content/v1/5e6756dc28b9185155759969/1699306862595-NJNSTCS33GMPUKEGUD0G/WhatsApp+Image+2023-11-06+at+16.25.49_d74b8ea2.jpg)